Block paving is one of the most popular hard-landscaping choices for UK driveways and paths. It looks smart, lasts for decades when properly laid, and, unlike solid concrete, individual blocks can be lifted and relaid if you need to access a drain or pipe underneath. Costs typically run from £60 to £130 per m² fully installed, though premium clay bricks or intricate patterns can push that higher.
This guide covers the main block types, the most common patterns, realistic 2026 costs, and what to ask a contractor before you sign anything.
Types of Block Paving
Concrete Blocks
Concrete (pressed or hydraulic) blocks are the go-to option for most UK driveways. They’re manufactured to consistent dimensions, commonly 200 × 100 mm in 50, 60 or 80 mm thicknesses, and come in a wide palette of colours and finishes. Makers sell standard 50 mm blocks for domestic driveways as well as patios and paths; the thicker 60 mm and 80 mm blocks are generally chosen where heavier vehicles are expected.1
Concrete blocks are cheaper than clay and easier to source from any builders’ merchant, but they can fade over time and are more susceptible to staining than a good clay brick. A basic 50 mm concrete driveway block costs around £26 per m² to buy.1
Clay Pavers
Clay pavers (also called brick pavers or paving bricks, and related to engineering bricks) are kiln-fired and colour-fast, they won’t fade because the colour runs right through. They’re denser and harder than concrete blocks, which makes them highly resistant to oil, de-icer salts, and heavy traffic. A clay-paved driveway laid in the 1980s will still look excellent today if it was bedded correctly.
The trade-off is cost: clay pavers cost several times as much as a basic concrete block to buy, and colour choice is narrower (mainly red, buff, and blue-black engineering brick tones).
Natural Stone Setts
Granite or sandstone setts give a more traditional, cobbled appearance. These are common in conservation areas and heritage streets. They’re harder to lay correctly (each piece varies slightly), more expensive to supply, and require an experienced contractor. Expect to pay £100–£180/m² installed for granite setts.
Common Patterns
The laying pattern affects both the look and the structural performance of the finished surface. Herringbone patterns in particular interlock under load and resist creep far better than running-bond arrangements.
| Pattern | Description | Best for | Relative cost |
|---|---|---|---|
| Herringbone (45°) | Blocks laid at 45° to the direction of travel | Driveways, highest structural performance | Standard |
| Herringbone (90°) | Same interlocking pattern, blocks square to boundary | Driveways, more formal look | Standard |
| Stretcher bond | Blocks laid in parallel rows with staggered joints | Paths and patios, not recommended for vehicles | Lower |
| Basket weave | Alternating pairs of blocks at 90° | Decorative patios; low-traffic areas | Standard–slight premium |
| Circular / fan | Radiating courses around a focal point | Feature areas, forecourts | 15–25% premium (labour) |
| Random/mixed | Irregular sizes for a natural look | Patios, paths | Variable, often higher |
For any driveway that takes vehicle loads, always specify herringbone, either 45° or 90°. The interlocking action distributes the load laterally through multiple blocks, preventing the surface from rutting or spreading over time.
Cost Breakdown
These figures reflect 2026 market rates for a standard residential driveway in England. Costs in London and the South East typically run higher.
| Item | Typical cost range |
|---|---|
| Concrete block paving (supply & lay) | £60–£85/m²2 |
| Clay paver paving (supply & lay) | £125–£185/m² |
| Granite sett paving (supply & lay) | £100–£180/m²3 |
| Edging/kerbing (per linear metre) | £25–£50 |
| Sub-base excavation & disposal | £15–£30/m² |
| Permeable block paving (SuDS compliant) | £75–£130/m² |
| Resin joint stabiliser (per m²) | £8–£15 |
Worked example, 40 m² driveway in concrete blocks:
- Excavation, sub-base (MOT Type 1), and sharp sand bed: 40 m² × £22 = £880
- Concrete blocks, bedding, and laying: 40 m² × £70 = £2,800
- Edging kerbs, 25 linear metres × £35 = £875
- Total (approximate): £4,555
Labour typically accounts for 40–55% of total cost. A two-person team usually lays around 15–20 m² per day on a straightforward driveway.
Planning Permission
Most domestic driveways don’t need planning permission, but there’s an important caveat for front gardens: since 1 October 2008, paving more than 5 m² between the house and the road needs planning permission unless the surface is permeable or the rainwater drains to a lawn or border within the property.45
Permeable block paving, where the joints are filled with grit rather than sand so that water drains through, needs no planning permission at any size.6 It must be laid on an open-graded sub-base (such as 4/20 or Type 3) rather than MOT Type 1, which has too many fines to let water through.7 This is the simplest way to comply without applying for planning permission, and it avoids the need for a separate drainage channel.
Always check with your local planning authority before work starts, especially in a conservation area or on a listed property.
Sub-Base and Bedding
The long-term performance of any block paved surface depends almost entirely on what’s underneath. For vehicles:
- Sub-base depth: at least 100 mm of compacted MOT Type 1 (crushed limestone or granite) for cars on conventional paving; more for heavier vehicles or soft ground.8
- Sand bed: about 50 mm of damp sharp (concreting) sand, compacted and screeded level before the blocks are laid. Do not use soft building sand: it migrates and the surface will become uneven.8
- Level: keep the finished paving at least 150 mm below the house’s damp-proof course so the driveway does not bridge it.9
- Compaction: blocks must be vibrated into place with a plate compactor (with a rubber pad to avoid surface damage) before the joints are brushed with kiln-dried sand.
Any reputable contractor will discuss sub-base depth with you; be wary of quotes that skip this conversation.
Maintenance
Block paving needs relatively little upkeep compared to resin or tarmac:
- Weeds: kiln-dried jointing sand inhibits weed germination but doesn’t eliminate it. Re-sanding every 2–3 years is good practice. A resin joint stabiliser greatly reduces weed growth.
- Stains: oil stains respond well to specialist degreasers; act quickly before the oil penetrates. Clay blocks stain less than concrete.
- Lifting and relaying: one of block paving’s great advantages, if a pipe needs access or a block cracks, individual units can be removed, the repair made, and the blocks relaid without any visible join.
- Pressure washing: once a year keeps the surface clean, but follow up by re-sanding the joints each time.
What to Ask Your Contractor
Before agreeing to any work, get clarity on these points:
- What depth of sub-base are you proposing, and what material?
- Will the driveway be permeable or will you install a drainage channel?
- What block specification (thickness, manufacturer, guarantee) are you supplying?
- How will you edge the driveway, and what happens at the boundary with the road?
- Does your quote include waste disposal?
- Are you a member of a trade body (such as BALI) or a manufacturer’s accredited-installer scheme, and do you offer a written guarantee?
A well-laid block paved driveway should last 20–30 years or more. The extra time spent choosing a competent contractor is worth it.
References (9)
Figures in this note were checked against the sources below on 30 September 2026. Superscript numbers in the text point to them. Every source the site cites, by topic.
- 1technicalsupplier figureBradstone, guidance.RN-QRRJP7A UK paving maker's product page for its standard 200 x 100 x 50 mm concrete block, sold for domestic driveways as well as patios and paths. It settles that 50 mm blocks are a normal driveway specification.
- 2costsupplier figureWickes Building Supplies Ltd.RN-PHHL94A price, true at 2026-09. the retail price Wickes Building Supplies Ltd publishes for Marshalls Driveline Priora Brindle Block Paving 200 x 100 x 60mm Pack of 404, which is the supply figure the cost book records for this item
- 3costsupplier figureWickes Building Supplies Ltd.RN-YTU3THA price, true at 2026-09. Wickes's product page for a Marshalls granite textured paving slab in mixed sizes, sold as a pack covering 17.9 m2, with the coverage stated. A published retail price for a named natural stone paving product, which is the dearer end of the paving range and the one a cobblestone or sett comparison is usually reaching for.
- 4technicalvery strongMinistry of Housing, Communities and Local Government, a government page.RN-V3VCFPThe Government's own explanatory guidance behind the front-garden paving rule, published 13 May 2009 as a 28-page PDF (710 KB). It explains the change to the General Permitted Development Order that took effect on 1 October 2008: the hard surfacing of more than 5 square metres of a domestic front garden is permitted development only where the surface is rendered permeable, or where the run-off is directed to a permeable or porous area within the curtilage. Traditional impermeable surfaces such as in-situ concrete or bitmac over an impermeable base need planning permission above that 5 square metre threshold. The guidance sets out the practical ways to comply: permeable block paving, porous asphalt and gravel; and the alternative of conventional paving laid to fall onto a lawn, border, soakaway or rain garden. It covers construction build-ups for driveways and paved areas and the principle of controlling and reducing rainfall run-off into drains. Read with Class F of Part 1 of Schedule 2 to the GPDO, which is the operative provision.
- 5technicalvery strongThe National Archives (legislation.gov.uk), legislation.RN-4C9X4BClass F permits the provision within the curtilage of a dwellinghouse of a hard surface for any purpose incidental to the enjoyment of the dwellinghouse, or its replacement in whole or in part. Condition F.2 applies where the hard surface would lie between a wall forming the principal elevation and a highway and its area would exceed 5 square metres: the surface must then be made of porous materials, or provision made to direct run-off water to a permeable or porous area or surface within the curtilage.
- 6technicalvery strongPlanning Portal, guidance.RN-VCANMUThe Planning Portal on paving a front garden: permission is not needed if the surface is permeable, or if run-off is directed to a permeable area within the curtilage, but it is needed for more than five square metres of impermeable surface draining to the road. The specific rule that makes a drive a planning matter, which surprises most people paving one.
- 7technicalvery strongMinistry of Housing, Communities and Local Government, guidance.RN-GDSCJJThe government's householder guidance on the 2008 front-garden paving rule. It confirms that a permeable driveway of any size, or one draining to a lawn or border, needs no planning permission.
- 8technicalsupplier figureMarshalls, guidance.RN-FURTWDA paving maker's laying guide for block paving: a sub-base of MOT Type 1 hardcore at least 100 mm deep, compacted in layers, before the sand bed and blocks.
- 9technicalsupplier figureMarshalls, guidance.RN-D0LOI4A paving maker's installation guidance for domestic block paving, requiring the finished block surface to sit at least 150 mm below the damp-proof course to avoid damp problems.
-
Driveway Block Paving (200 x 100 x 50 mm), Bradstone, accessed 30 September 2026. bradstone.com
-
Marshalls Driveline Priora Brindle Block Paving 200 x 100 x 60mm Pack of 404, Wickes Building Supplies Ltd, accessed 30 September 2026. Priced at 2026-09, so no calibration is needed. wickes.co.uk
-
Marshalls Granite Eclipse Mixed Size Textured Light Grey Paving Slab 17 9m2, Wickes Building Supplies Ltd, accessed 30 September 2026. Priced at 2026-09, so no calibration is needed. wickes.co.uk
-
Permeable surfacing of front gardens: guidance, Ministry of Housing, Communities and Local Government, accessed 30 September 2026. gov.uk
-
The Town and Country Planning (General Permitted Development) (England) Order 2015, Schedule 2, Part 1, Class F, legislation.gov.uk, accessed 30 September 2026. legislation.gov.uk
-
Paving your front garden: planning permission, Planning Portal, accessed 30 September 2026. planningportal.co.uk
-
Guidance on the permeable surfacing of front gardens, Ministry of Housing, Communities and Local Government, accessed 30 September 2026. gov.uk
-
How To Lay Block Paving: A Guide To Laying Block Paving, Marshalls, accessed 30 September 2026. marshalls.co.uk
-
Driveline Priora Concrete Paving, domestic application installation guidance, Issue 7, Marshalls, accessed 30 September 2026. media.marshalls.co.uk