References

Trades & Labour

285 sources in the library on trades & labour, 13 on this page cited in a published note. Each one says what the document covers and what it is good for. Name a source to see which document it is and where to read it. One at a time. Page 5 of 8.

  1. good RN-D2653H cited

    The Joint Contracts Tribunal

    The publisher's own product page for the JCT Home Owner contract variant intended for a home owner or occupier who has appointed a consultant to administer the contract on their behalf, which is the HO/C form as distinct from HO/B where the homeowner deals with the builder directly. It sits in JCT's Home Owner Contracts category, the suite JCT publishes specifically for domestic building work rather than commercial projects. Use this to confirm which JCT home owner form applies when a note tells a reader to put the job on a written standard contract.

    Cited in JCT Home Owner Contracts Explained (HO/B & HO/C), Loft Conversion Quotes: Compare Builders, Avoid Overpaying.

  2. fair RN-T1F5JL cited

    Age UK

    Age UK's advice for older people on doorstep scams, listing rogue traders who claim to have noticed a fault with the property as a common type and advising never to buy from door-to-door sellers.

    Cited in Cowboy Builders: Warning Signs Before & During a Job.

  3. fair RN-U589OO cited

    Centre for Effective Dispute Resolution (CEDR)

    CEDR's 2025 survey of UK civil and commercial mediators, reporting average fees for a one-day mediation and the settlement rates on the day and shortly after.

    Cited in Mediation for Building Disputes: Costs & How It Works.

  4. fair RN-IED4GG cited

    Citizens Advice

    Citizens Advice sets out six steps for a homeowner before work starts: check if you need permission or approval, find good traders, get quotes before deciding, check that you and your trader have insurance, get a written contract, and know what to do if there are problems. Advice applies to England, with separate versions for Northern Ireland, Scotland and Wales. It names the professional registers to search: a planning consultant on the Royal Town Planning Institute website, a surveyor on the RICS website and an architect on the Architects Registration Board website. Warns that without the permission or approval needed you might be fined, prosecuted, made to put things right or undo the work, and may have problems selling later. Confirms planning permission is usually needed to build something new such as an annexe, to make a major change such as an extension, or to change the use of a building.

    Cited in Building Contracts: The Complete Guide, Cowboy Builders: Warning Signs Before & During a Job, Day Rate vs Fixed Price: Which to Agree for Building Work, How to Brief a Builder: Writing a Scope of Works and 4 more.

  5. fair RN-K22APC cited

    Citizens Advice

    Citizens Advice guidance for England on what to do when work at home goes wrong. Says the problem must be taken up with the trader who arranged the work even if they subcontracted all or part of it, and to gather paperwork and receipts, take photographs as evidence and note dates and times first. Where the job is poor, it explains that the Consumer Rights Act 2015 requires reasonable care and skill and gives the consumer the right to ask the trader to fix the problem where goods were supplied with the service, or to get a refund and stop the trader doing more work where only a service was supplied. Provides wording a homeowner can use when complaining, suggests asking for money off for inconvenience such as 5% of the cost as a goodwill gesture, and states the trader should fix the problem within a reasonable time and at no extra charge.

    Cited in Builders' Merchants: The Complete UK Guide (2026), Cowboy Builders: Warning Signs Before & During a Job, How Cost Estimates Work: Levels, Accuracy and Error Margins, Quote vs Estimate: What's the Difference.

  6. fair RN-7CRRCI cited

    Civil Mediation Council

    The Civil Mediation Council's plain explanation of mediation: a confidential process in which a neutral mediator helps the parties settle but cannot impose a solution, with offers made without prejudice.

    Cited in Mediation for Building Disputes: Costs & How It Works.

  7. fair RN-CRMHE0 cited

    Civil Mediation Council

    The Civil Mediation Council's fixed-fee mediation scheme for civil claims up to £50,000, giving the fee per party and session length for each claim band.

    Cited in Builder Disputes: The Complete Guide, Mediation for Building Disputes: Costs & How It Works.

  8. fair RN-4BJC1J cited

    Financial Ombudsman Service

    Financial Ombudsman Service guidance on Section 75 and chargeback: the cash price decides whether Section 75 applies, so part-payment by credit card is enough, within the £100 to £30,000 limits.

    Cited in Section 75: Paying Your Builder by Credit Card.

  9. fair RN-NT3AMI cited

    FMB Insurance

    The Federation of Master Builders' insurance arm describing its insurance-backed guarantee, which pays to rectify defects in guaranteed work if the builder has ceased trading.

    Cited in Insurance-Backed Guarantees for Building Work Explained.

  10. fair RN-R4944Z cited

    The Joint Contracts Tribunal

    The Joint Contracts Tribunal's page for its Home Owner contracts, which it describes as written for homeowners appointing contractors or consultants for building work.

    Cited in Builder Contracts & JCT: Protecting Yourself, Extension Cost Per m² by Type, How to Find & Vet a Good Builder.

  11. fair RN-L0783S cited

    The Joint Contracts Tribunal

    The Joint Contracts Tribunal's description of the Minor Works Building Contract: for smaller, simple projects where the employer supplies the design, usually through an architect.

    Cited in Builder Contracts & JCT: Protecting Yourself, Building Contracts: The Complete Guide, How to Find & Vet a Good Builder.

  12. fair RN-RMXPPI cited

    Which?

    Which? report of January 2026 explaining that the national fraud reporting centre Action Fraud has been replaced by Report Fraud, run by the City of London Police.

    Cited in Cowboy Builders: Warning Signs Before & During a Job.

  13. supplier figure RN-YKGMID cited

    Visa

    Visa's UK consumer page on chargebacks, written by the card scheme that sets the rule. It states the 120-day window for a chargeback claim on a Visa debit or credit card.

    Cited in Builder Deposits: How Much Is Normal in the UK?.

  14. very strong RN-4ATLE5

    Building Control Northern Ireland (the 11 district councils)

    NORTHERN IRELAND. The Northern Ireland Building Regulations are made by the Department of Finance and administered by the 11 DISTRICT COUNCILS, so there is no private sector alternative: Northern Ireland has no approved inspectors and no registered building control approvers, and the England route of appointing a private building control body simply does not exist. The page lists the Building Regulations (Northern Ireland) 2012 with the amending regulations of 2014, 2016 and 2022, and links the current and historical Technical Booklets plus the contraventions and appeals route. The regulations are intended to secure the safety, health, welfare and convenience of people in and around buildings and to further the conservation of fuel and energy. The site names all 11 councils including Belfast City, Derry City and Strabane, Lisburn and Castlereagh, Newry Mourne and Down, Mid Ulster and Fermanagh and Omagh.

  15. very strong RN-56GNUE

    Building Safety Regulator (GOV.UK)

    The Building Safety Regulator is an executive non-departmental public body sponsored by the Ministry of Housing, Communities and Local Government. Its remit is to regulate higher-risk buildings, raise safety standards for England's buildings and improve built environment competence across England and Wales. It is the body that holds and publishes the registers a homeowner can check: the register of building inspectors in England and the collection covering building control bodies and registered building control approvers. Its powers derive from the Building Safety Act 2022, which also sets the duties on accountable persons for high-rise residential buildings. Use this as the parent page when pointing a reader at the statutory registers rather than at a trade association's own directory.

  16. very strong RN-MWFU2Q

    Building Safety Regulator / HSE (GOV.UK)

    Since 6 April 2024 an individual carrying out restricted building control functions in England or Wales must be a registered building inspector; doing so unregistered is a criminal offence. The guidance sets out the application: personal details, the class of building inspector applied for (class 1 upward, with a separate classes and categories guide), evidence of a BSR-approved competency assessment, professional body memberships, employment status and confirmation of compliance with the code of conduct. Registration lasts 4 years from the date of approval, with registrations made before 6 April 2024 running their 4 years from that date. The registration fee is £336 whether for England, Wales or both, and an annual maintenance charge of £216 falls due from the first anniversary. Useful for a homeowner checking that the person signing off their extension is actually entitled to.

  17. very strong RN-R54RCK

    Department for Business and Trade

    Published 31 March 2026, last updated 21 August 2026, and applying to England, Scotland and Wales. States that the UK continues to recognise the CE marking alongside or in place of the UKCA marking for the Great Britain market under the Product Safety and Metrology (Amendment) Regulations 2024, so a CE marked product remains lawful to place on the GB market and manufacturers may choose either route. Sets out the UKCA and CE regimes spanning over 20 product types, and the duties of each economic operator: the manufacturer designs and marks the product, applies identification details (name, trade name or trademark and postal address) and retains the technical documentation. Northern Ireland uses CE or CE and UKNI marking instead, and the UKCA marking does not apply in Guernsey, Jersey, the Isle of Man or the British Overseas Territories.

  18. very strong RN-W8X467

    GOV.UK (Department for Energy Security and Net Zero)

    The government's own instruction on vetting a heat pump installer, and the source for two acronyms most homeowners have never heard of. An installer must hold Microgeneration Certification Scheme (MCS) certification for the homeowner to claim government funding such as the Boiler Upgrade Scheme; MCS certification requires the installer to demonstrate technical competence and to use products meeting appropriate standards. Separately, an MCS certified installer must be registered with at least one consumer protection scheme, named here as RECC (Renewable Energy Consumer Code) or HIES, which is what provides redress if something goes wrong during or after the installation. So the check is two-part: MCS for competence and the grant, and RECC or HIES for the consumer protection, and a homeowner should ask which of the two the installer belongs to before signing.

  19. very strong RN-PPKIQ6

    Health and Safety Executive

    HSE's task sheet library for building, maintenance and allied trades carrying out non-licensed work with asbestos. Includes equipment and method sheets EM0 to EM10 covering risk assessments and plans of work, what to do on accidental disturbance, information instruction and training, building and dismantling a mini-enclosure, using a class-H vacuum cleaner, wetting asbestos materials, PPE and RPE, damp rag cleaning of minor contamination, personal decontamination, disposal of asbestos waste, and a statement of cleanliness after textured coating removal. Task sheets A9 to A16, A35 and A36 cover non-licensed work with asbestos cement such as drilling, cleaning gutters, removing debris, cleaning weathered roofing and cladding, repairing damage, removing sheets and dismantling small structures. Sheets A26 to A29 cover textured coatings including drilling, inserting screws and removing a small area of about 1 square metre. Sheets A1 onward cover strictly controlled minor work on asbestos insulating board. This is the source for what a competent contractor should actually be doing on a small asbestos job.

  20. very strong RN-I45I02

    Health and Safety Executive

    HSE's summary of the principal designer role, which a homeowner running an extension will be told they need but is rarely given a plain definition of. A principal designer is a designer, an organisation or on smaller projects an individual, appointed by the client to take control of the pre-construction phase of any project involving more than one contractor. The duties are to plan, manage, monitor and coordinate health and safety in the pre-construction phase; to help the client gather the pre-construction information and pass what is needed to designers and contractors; to work with other designers to eliminate foreseeable health and safety risks and, where that is not possible, reduce or control them; to ensure everyone involved communicates and cooperates; and to keep the principal contractor informed of risks that will need managing during construction. On a domestic project where no appointment is made, the designer in control of the pre-construction phase becomes the principal designer by default, and the principal designer may agree in writing to take on the client duties instead of the contractor.

  21. very strong RN-4A5HVQ

    Health and Safety Executive

    HSE guidance (updated 22 June 2026) stating that over 500 construction workers are believed to die each year from silica dust exposure, and that construction dust causes lung cancer, asthma, COPD and silicosis. Dust control is a legal duty under the COSHH Regulations, following an assess, control and review model, with detailed guidance in construction information sheet CIS 36.

  22. very strong RN-UBIBZP

    Health and Safety Executive

    HSE's definition of a contractor under CDM 2015: anyone who directly employs or engages construction workers or manages construction work, including sub-contractors and any self-employed worker or business that carries out, manages or controls construction work, who must have the skills, knowledge, experience and, where relevant, the organisational capability to do the work safely. On all projects a contractor must make sure the client is aware of the CDM 2015 client duties before work starts, plan manage and monitor all their own work taking account of risks to anyone affected including members of the public, check that workers they employ or appoint have the necessary skills knowledge training and experience or are obtaining them, provide a suitable site-specific induction unless the principal contractor has already done so, provide appropriate supervision information and instructions, take reasonable steps to prevent unauthorised access before starting on site, and provide and maintain suitable welfare facilities from the start. On projects with more than one contractor they must also coordinate with the rest of the project team, comply with directions from the principal designer or principal contractor, and comply with the relevant parts of the construction phase plan. This is the source for what changes when a homeowner engages several trades directly rather than one main contractor.

  23. very strong RN-NVUJOF

    Health and Safety Executive

    HSE guidance (updated 22 November 2024) confirming demolition is construction work under CDM 2015. The client must give the local authority at least 6 weeks' notice before demolition starts and must have a refurbishment or demolition asbestos survey carried out by a competent surveyor before contractors begin. The method of demolition must be set out in writing by a competent person, exclusion zones must keep debris within the site boundary, and top-down demolition is preferred on confined urban sites.

  24. very strong RN-DWSXF9

    Health and Safety Executive

    The HSE leaflet a decorating or period-property note should cite on lead paint. Names the highest-risk activities as blast removal and burning of old lead paint, stripping old lead paint from doors and windows, hot cutting in demolition and dismantling, some painting of buildings, and soldering. Corrects a common misconception: lead is not absorbed through the skin, except as lead alkyls and lead naphthenate, so the routes of entry are breathing in lead dust, fume or vapour and swallowing lead by eating, drinking, smoking or nail-biting without washing hands and face first. Absorbed lead circulates in the blood and is stored mainly in the bones, where it can remain for years without symptoms. Early effects are headaches, tiredness, irritability, constipation, nausea, stomach pains, anaemia and weight loss; continued uncontrolled exposure can cause kidney damage, nerve and brain damage and infertility. Flags that an unborn child is at particular risk, especially in the early weeks before a pregnancy is known. Where exposure is significant as defined in law, the employer must supply protective clothing, launder it, measure airborne lead, supply respiratory protective equipment if the occupational exposure limit cannot be met, and arrange blood-lead medical surveillance.

  25. very strong RN-WCSBW4

    Health and Safety Executive

    HSE's official guidance on CDM 2015, and the single best source for how the Regulations treat a homeowner. Paragraph 53 defines a domestic client as someone who has construction work done on their own home, or the home of a family member, not in connection with a business; local authorities, housing associations, charities, landlords and other businesses owning domestic property are not domestic clients, and neither is a homeowner whose work relates to a business attached to the premises such as a shop. Regulation 7(1) passes the client duties in regulations 4(1) to (7) and 6 to the contractor where there is one contractor, the principal contractor where there is more than one, or the principal designer where there is a written agreement to that effect. Regulation 7(2): if the client makes no appointments, the designer in control of the pre-construction phase is the principal designer and the contractor in control of the construction phase is the principal contractor. Regulation 6(1): a project is notifiable to HSE if the construction work is scheduled to last longer than 30 working days and have more than 20 workers simultaneously at any point, or to exceed 500 person days, using the electronic F10 form. Schedule 2 sets the minimum welfare facilities.

  26. very strong RN-QCVXJH

    Health and Safety Executive

    The list of injuries that must be reported to HSE under RIDDOR, which matters to a homeowner because on a domestic project the reporting duty sits with the contractor in control of the work rather than with the household. Specified injuries are: all fractures other than to fingers, thumbs and toes; amputation of an arm, hand, finger, thumb, leg, foot or toe, including surgical amputation following an accident; any injury likely to cause permanent blinding or reduction in sight; crush injuries to the head or torso causing damage to the brain or internal organs; serious burns covering more than 10% of the body or causing significant damage to the eyes, respiratory system or other vital organs; any scalping requiring hospital treatment; loss of consciousness caused by head injury or asphyxia; and any injury from working in an enclosed space leading to hypothermia or heat-induced illness, or requiring resuscitation or admission to hospital for more than 24 hours. Separate rules cover incapacity for more than seven consecutive days.

  27. very strong RN-905SBO

    Health and Safety Executive

    HSE's dutyholder table for CDM 2015. Defines a domestic client as someone having construction work done on their own home, or a family member's home, that is not part of a business; domestic clients are in scope but their client duties normally transfer to the contractor on a single contractor project and to the principal contractor where there is more than one contractor, unless the domestic client instead makes a written agreement with the principal designer to carry out the client duties. Commercial clients must make suitable arrangements for managing the project, appoint other dutyholders, allocate sufficient time and resources, prepare and provide relevant information, ensure the principal designer and principal contractor carry out their duties, and ensure welfare facilities are provided. Designers must eliminate, reduce or control foreseeable risks arising during construction and during maintenance and use. Principal designers are designers appointed by the client on projects involving more than one contractor.

  28. very strong RN-O1NRXC

    HM Revenue & Customs (GOV.UK)

    Under CIS a contractor deducts money from a subcontractor's payments and passes it to HMRC as an advance payment towards the subcontractor's tax and National Insurance. Contractors must register; subcontractors need not, but unregistered subcontractors have deductions taken at a higher rate. A business that does not itself do construction work must register as a contractor once it has spent more than 3 million pounds on construction in the 12 months since its first payment. CIS covers site preparation, demolition and dismantling, building work, alterations, repairs and decorating, installing heating, lighting, power, water and ventilation systems, and internal cleaning after construction. It excludes architecture and surveying, scaffolding hire without labour, carpet fitting, manufacture of materials, and delivering materials. Useful for explaining why a homeowner engaging trades directly is not a CIS contractor.

  29. very strong RN-1X77D2

    HM Revenue and Customs

    Defines the boundary of the scheme, which decides whether a given trade's invoice should carry a CIS deduction. Work covered is most construction work to a permanent or temporary building or structure and civil engineering such as roads and bridges, and expressly includes preparing the site such as laying foundations and access works, demolition and dismantling, building work, alterations, repairs and decorating, installing systems for heating, lighting, power, water and ventilation, and cleaning the inside of buildings after construction work. The listed exceptions are architecture and surveying, scaffolding hire with no labour, carpet fitting, making materials used in construction including plant and machinery, delivering materials, and work on construction sites that is clearly not construction such as running a canteen. Confirms contractors must register but subcontractors need not, though unregistered subcontractors suffer deductions at a higher rate, and that the same rules apply to a business based outside the UK doing construction work in the UK.

  30. very strong RN-RVXVV0

    HM Revenue and Customs

    Carries the actual deduction rates, which explain the difference between two builders' quotes and the numbers on a subcontractor's payment statement. A contractor must deduct 20 per cent from payments to a registered subcontractor, called net payment status or payment under deduction, and pass it to HMRC as an advance payment towards the subcontractor's tax and National Insurance. If the subcontractor is not registered for the scheme, the contractor must deduct 30 per cent instead. A subcontractor who does not want deductions taken in advance can apply for gross payment status, which also registers them for CIS. Registration applies to a sole trader, the owner of a limited company, or a partner in a partnership or trust, and is not required of an employee.

  31. very strong RN-6V9WLL

    HM Revenue and Customs

    The duties that attach to anyone who pays subcontractors for construction work, which matters for a homeowner acting as their own main contractor and for judging whether a builder is operating properly. Registration as a contractor is required if you pay subcontractors to do construction work, or if your business does not do construction work but has spent more than 3 million pounds on construction in the 12 months since the first payment. The six rules are: register before taking on the first subcontractor; check whether the person should be employed rather than subcontracted, with a penalty if they should be an employee; verify with HMRC that subcontractors are registered with CIS; make deductions from payments and pay them to HMRC, the deductions counting as advance payments towards the subcontractor's tax and National Insurance; file monthly returns and keep full CIS records, with a penalty for failing to; and notify HMRC of changes to the business.

  32. very strong RN-3MHLSF

    Ministry of Housing, Communities and Local Government

    The 8 page document that sets out what a competent person scheme operator must satisfy, and it is what connects UKAS accreditation to the schemes a homeowner meets. Records that schemes are authorised under paragraph 4A of Schedule 1 to the Building Act 1984 and named in Schedule 3 to the Building Regulations 2010 as amended, and that in all cases demonstration must be sufficient to meet BS EN ISO/IEC 17065:2012, the product certification body standard. Condition 1 requires the scheme operator to achieve and maintain UKAS accreditation to BS EN ISO/IEC 17065:2012, within one year of authorisation for an extension to an existing scheme or within two years for a new scheme operator, with a UKAS pre-assessment submitted with the application. Condition 3 requires assessors and inspectors to be competent at least to the equivalent level in the relevant sector Minimum Technical Competence assessment procedure. Condition 4 requires a transparent fee structure, self-financing within not later than five years of authorisation, and use of registrants' registration and notification fees only for the benefit of registrants or the sector. Condition 5 requires documented management of conflicts of interest, noting the risk where a scheme is owned by a larger commercial, trade or professional body. In force for any UKAS assessment begun on or after 1 April 2016.

  33. very strong RN-0D3FRR

    Ministry of Housing, Communities and Local Government

    The publication page for the conditions a competent person self-certification scheme operator must meet, applying to England, first published 6 June 2012 and last updated 1 April 2016, from which date the conditions bite on any UKAS assessment begun on or after 1 April 2016. Hosts two documents: the main Competent person schemes conditions of authorisation of April 2016, an 8 page PDF of 289 KB, and a separate Building regulations: air tightness testing schemes conditions of authorisation of 5 pages and 141 KB, added 31 July 2014, because air tightness tester schemes carry different requirements from other types of work. Useful for establishing that a competent person scheme is a government-authorised, UKAS-accredited certification body rather than a trade membership list.

  34. very strong RN-WDQPUZ

    Ministry of Housing, Communities and Local Government

    The only official series on how large the competent person schemes actually are, collected every 6 months from the schemes authorised in schedule 3 of the Building Regulations 2010 as amended, covering total registered membership at the end of each period and the number of jobs those members undertook. Published 12 December 2012 and last updated 6 June 2018, with the latest document a 24 page PDF covering 1 October 2006 to 31 March 2018, so the series has not been refreshed since 2018 and any current membership figure quoted from it is dated. Three caveats matter for anyone citing the numbers: registered membership is counted by business not by individual, so the number of competent individuals is higher than the membership figure; the statistics combine all types of work except electrical installations for each scheme operator to avoid double counting members and notifications, because many members do more than one type of work; and schemes have changed over the collection period, so past and current data are not always meaningfully comparable.

  35. very strong RN-59I5I8

    nidirect (Northern Ireland Executive)

    nidirect's consumer guidance for Northern Ireland, where the Great Britain routes such as Citizens Advice consumer service and the FMB do not apply in the same way. Doorstep selling is lawful, and goods and services bought at the door must still be of satisfactory quality, fit for purpose and as described. There is a 14-day right to cancel any doorstep purchase over £42, whether paid in cash or on credit, and the same applies to credit and hire purchase agreements. The page names the classic doorstep-crime patterns in home improvement: traders who say guttering, roofing, gardening or paving needs urgent repair, take a deposit and never return, charge unreasonable prices, give no cancellation notice, or do poor-quality work. Practical steps include verifying the seller's ID and address, getting a receipt and never paying large sums up front. Reporting and escalation is through Consumerline, with Advice NI for guidance and the Small Claims Court for disputes up to £5,000; Consumerline also issues a No Cold Calling sticker.

  36. very strong RN-EGUTOO

    nidirect (Northern Ireland Executive)

    The Northern Ireland complaint ladder, which runs through Consumerline rather than the Citizens Advice consumer service used in England and Wales. Step one is to raise it directly with the trader, gathering receipts, checking the firm's complaints policy and identifying the right person. Step two is a formal written complaint by post or email, quoting a reference, stating the legal basis (Consumer Rights Act and related legislation) and sending by recorded delivery. Step three is a follow-up letter with a copy of the original if there is no reply in about 14 days. Consumerline is the advisory body and the gateway that refers a case to the Trading Standards Service for investigation where it judges that appropriate; sector ombudsman schemes listed by the Ombudsman Association are the independent route where the trader belongs to one, and local councils handle illegal street trading. The page advises writing as soon as possible after discovering the problem and expecting replies within roughly 14 days.

  37. very strong RN-PRQQZD

    Office for National Statistics

    the Annual Survey of Hours and Earnings, Table 3, which gives gross hourly and weekly pay by region and by two-digit Standard Occupational Classification. It is the statutory earnings survey, so it records what construction trades are PAID rather than what they charge, which is why the book keeps wage and charge-out rates apart

  38. very strong RN-6SC9FZ

    Office for National Statistics

    ONS bulletin from the Annual Survey of Hours and Earnings, released 23 October 2025 with April 2025 data. Median weekly earnings for full-time employees were 766.60 pounds in April 2025, up 5.3% in nominal terms and 1.1% in real terms on the year using CPIH. Median gross annual earnings for full-time employees were 39,039 pounds in April 2025 against 37,439 pounds in April 2024, up 4.3%. All 2025 estimates are provisional. Useful as the employed-earnings baseline against which self-employed trade day rates are compared.

  39. very strong RN-I3VUJ8

    Scottish Courts and Tribunals Service

    Scotland's equivalent of the small claims track, and the figures differ sharply from England and Wales. A Simple Procedure claim can be made for payment of a sum of money where the value of the claim is 5,000 pounds or less, or for delivery or recovery of moveable property or an order to make someone do something, but in each of those cases only where there is an alternative money claim of 5,000 pounds or less. Where the value of the claim is over 5,000 pounds the ordinary cause procedure must be followed instead, so a Scottish homeowner with a 7,000 pound builder dispute is not in the simple track at all, unlike an English claimant whose small claims track runs to 10,000 pounds. Claims are made in the sheriff court by a claimant against a respondent, decided by a sheriff or summary sheriff, and no solicitor is required. New rules apply to claims initiated on or after 31 May 2023, and claims should be submitted through Civil Online, with sheriff approval needed to proceed on paper. Advises trying to settle first and considering Alternative Dispute Resolution, to which the sheriff may also refer parties after the claim form is lodged.

  40. very strong RN-NBV4MJ

    Scottish Government

    The Scottish equivalent of English competent person self-certification, and it works differently in ways every England-written note misses. Scotland uses a building warrant system under the Building (Scotland) Act 2003, with roles split between verifiers, approved building professionals (approved bodies and approved certifiers), local authorities and building owners. Certification in Scotland is optional, not the default, and covers design or construction, applying only where the work requires a building warrant; the works that can be certified are listed on the Scottish Government Certification Register, and the Scottish Government maintains the only authoritative list of registered approved building professionals. The benefit stated is that the work is certified by qualified building professionals as complying with regulations. Related guidance includes the Certification Handbook, Procedural Guidance on Certification covering what to submit with a building warrant application, and Modern methods of construction guidance for verifiers and certifiers. Applications for building warrants and completion certificates are submitted online through the eBuildingStandards.scot portal via an eDevelopment account.