Buy a house with a rotten conversion and you meet the cruel gap in ordinary law: the contract for that botched work was someone else’s, so contract claims aren’t yours to bring. A 1972 statute exists for exactly this gap, and a 2022 one quietly turned it into one of the most powerful tools in residential construction law.

The duty

Section 1 of the Defective Premises Act: anyone who takes on work “for or in connection with the provision of a dwelling” owes a duty to do the work in a workmanlike (or professional) manner, with proper materials, so that the dwelling is fit for habitation when completed.1 Three limbs, and claimants must ultimately land the third: the defect renders the home unfit to live in, structural inadequacy, serious damp and mould, dangerous services, failed waterproofing. Cosmetic and middling defects don’t reach the bar; this is the statute for the serious end.

“Provision of a dwelling” covers building new homes and, in the Act’s words, dwellings provided “by the conversion or enlargement of a building”; substantial refurbishment sits in a greyer zone the courts assess on facts, but loft conversions and major remodels creating habitable space have the right shape.1 For work completed after 28 June 2022, a separate s.2A duty added by the Building Safety Act covers work done in the course of a business on an existing building that contains a dwelling, so later refurbishment has its own route.2

Who owes it: and to whom

The duty catches the whole delivery chain: the builder, the developer who commissioned, the architect and engineer who designed, specialist subcontractors for their piece.1 And it is owed “to every person who acquires an interest (whether legal or equitable) in the dwelling”, the original client and every later buyer.1 That second half is the Act’s superpower: it hands a claim to the person who never had a contract with anyone involved. It cannot be excluded by contract terms, either, s.6 voids attempts to contract out.3

The time limits that changed everything

Historically claims ran six years from completion, expiring before many serious defects surfaced.1 The Building Safety Act 2022 rewrote this for s.1 claims:

  • work completed on or after 28 June 2022: 15 years;4
  • work completed before 28 June 2022: 30 years, retrospectively revived, meaning defective work from the 1990s onwards became actionable again in 2022.4

A structurally inadequate 2005 conversion, long out of time under every other route, may today be a live DPA claim against the firm that built it (existence and solvency permitting, the practical catch with any claim against a long-ago builder). The full limitation landscape sits in our limitation periods guide.

Running a DPA claim in practice

The shape mirrors any serious defects claim: an expert report establishing the defect, its cause in the original work, and unfitness for habitation; identification of who took on the work (building control records, planning files, warranty documents and Land Registry all help reconstruct old projects); then the standard escalation, though claims of this seriousness usually justify a construction solicitor early. Damages cover putting the dwelling right and consequential losses.

Where it sits in your toolkit

Against your own recent builder, the Consumer Rights Act and contract are simpler routes. The DPA matters when you bought the problem (no contract of your own), when time has beaten contract claims, or when the target worth suing is the developer or designer rather than an evaporated building company. For dwellings with serious defects and a solvent defendant somewhere in the chain, the 1972 Act, with its 2022 time machine, is often the last door still open, which is exactly why it belongs in the construction law pillar’s map.

This guide is general information for homeowners in England and Wales, not legal advice.

References (4)

Figures in this note were checked against the sources below on 30 September 2026. Superscript numbers in the text point to them. Every source the site cites, by topic.

  1. 1technicalvery strongThe National Archives (legislation.gov.uk), legislation.RN-TD41J9Section 1(1) imposes a duty on anyone taking on work for or in connection with the provision of a dwelling, whether by erection, conversion or enlargement, owed both to the person to whose order the dwelling is provided and to every person who later acquires a legal or equitable interest in it, to see that the work is done in a workmanlike or professional manner, with proper materials, and so that the dwelling will be fit for habitation when completed. Section 1(2) treats a person working to another's instructions as discharging the duty to the extent the work follows them properly, except where they owed and failed in a duty to warn of defects in the instructions; section 1(3) says merely agreeing to a specified manner, materials or design is not giving instructions. Section 1(4) brings a business that arranges for another to do the work within the duty. Section 1(5) fixes the accrual of the cause of action at the date the dwelling was completed for Limitation Act 1980 purposes, with a fresh accrual for any later rectification work when that further work is finished. The duty runs to subsequent owners, which contract claims do not.
  2. 2technicalvery strongThe National Archives, guidance.RN-LEM6X3The section that inserted s.2A into the Defective Premises Act 1972. It came into force on 28 June 2022 and applies only to work completed after that date.
  3. 3technicalvery strongThe National Archives, guidance.RN-RRXDAJSection 6(3) makes void any contract term that tries to exclude or restrict the Act's duties or the liability arising from them.
  4. 4technicalvery strongThe National Archives, guidance.RN-2HF4ITThe limitation section inserted by the Building Safety Act 2022 on 28 June 2022. It sets a 15-year limit for Defective Premises Act s.1 and s.2A claims, and 30 years for s.1 claims that accrued before that date.
  1. Defective Premises Act 1972, section 1: Duty to build dwellings properly, The National Archives, accessed 30 September 2026. legislation.gov.uk

  2. Building Safety Act 2022, section 134: Duties relating to work to dwellings etc, The National Archives, accessed 30 September 2026. legislation.gov.uk

  3. Defective Premises Act 1972, section 6: Supplemental, The National Archives, accessed 30 September 2026. legislation.gov.uk

  4. Limitation Act 1980, section 4B: Time limit for certain actions in respect of damage or defects in relation to buildings, The National Archives, accessed 30 September 2026. legislation.gov.uk